Power generation · Operating budget
Choose the cost question you need to answer. Each calculation uses the figures and assumptions you enter. The result is a scenario, not evidence of savings.
Compare annual generator budgets
Choose a profile and enter one year of site records. The three columns are separate comparisons; do not add them together. Use the same meter boundary, currency and tax basis. Enter zero only for a confirmed zero; leave unknown figures blank.
Readiness is a portion of the recorded budget, not an extra charge. Allocate service, equipment and test costs once. Compare backup budgets only for the same critical load and required duration. No delivered kWh means no cost per kWh; annual costs still apply.
Regular supply
Check the highlighted entry. Use a non-negative number; the readiness portion cannot exceed the recorded annual total.
Part-load operation
Check the highlighted entry. Use a non-negative number; the readiness portion cannot exceed the recorded annual total.
Standby
Check the highlighted entry. Use a non-negative number; the readiness portion cannot exceed the recorded annual total.
Changing the currency clears monetary entries; changing a fuel unit clears the corresponding quantity and factor. No values are converted.
| Budget measure | Regular supply | Part-load operation | Standby |
|---|---|---|---|
| Recorded annual cost | |||
| Fuel cost per net kWh | |||
| Recorded cost per net kWh | |||
| Annual readiness cost per protected kW | |||
| Direct combustion CO₂ for the year | |||
| Direct combustion CO₂ per net kWh |
A dash means that a required input or denominator is missing, or that the denominator is zero.
Use one fuel per profile and a direct combustion factor in the selected unit. Use the same reference conditions for gas as in the fuel record. The carbon figures exclude upstream emissions. A price change alone does not change them. Scenario calculator ↗
Calculate with my site data
Calculate with my site data
Your budget assumptions
Replace the example values with your records. All monetary inputs must use the same currency and tax basis.
Sources and scope: Caterpillar · LEHE1170-04 · 05/2025 · Prime-load fuel consumption · p. 1
Power generation
Mixed-fleet budget calculator
Which groups account for your fuel spending and combustion CO₂? Build the annual baseline from your own purchases and activity records. Then test a change in fuel use.
Separate routine generation from standby and test runs. Use recorded engine hours and fuel use per hour, or the measured annual quantity; the electrical rating alone does not tell you fuel use.
Start your fleet
Each line covers one group and one fuel. Use the same reporting year throughout and split different fuels into separate lines.
Model boundaries and sources
Only CO₂ released in combustion is compared, including biogenic CO₂ where applicable. Fuel production, upstream transport, methane slip and N₂O are excluded. A maritime ETS estimate here covers the CO₂ component only.
Fuel spending includes the invoiced price. Only a separately payable CO₂ charge is added to the cash budget. Embedded costs and internal carbon prices are shown for reference in their original currency.
US EPA · 2025 · Table 2 · UK DESNZ · 2026 · EU MRV · 2023/2776 · EU ETS · FAQ
Calculation scenario
Use the figures you have available: annual fuel use, annual distance or operating hours. Choose the matching fuel unit and purchase currency.
The reduction is your assumption. The calculator shows what would follow from your inputs. It does not measure a saving, predict a return or establish an environmental benefit. How we assess environmental effects ↗
After calculating a scenario, copy it into the brief or open a blank one.
Use the same unit for fuel quantity, consumption and price. Gas litres or US gallons refer to liquid fuel only. No density or standard-volume conversion is assumed. Enter plain numbers without thousands separators; a decimal point or comma is accepted. All calculated quantities and costs refer to one year.
Results cover the selected fleet and year. They estimate costs from your inputs; they are not a verified emission report or a complete compliance bill.
Your assumptions define this scenario. It is not a forecast or product guarantee. Keep price and cost figures on the same tax basis. An omitted cost does not mean zero cost.
EU fuel-price reference ↗