Operating decisions
Separate yard shunting from line haul. Review locomotive waiting time; use approved automatic engine stop/start or auxiliary power only where temperature, brake-air requirements and restart readiness permit.

A terminal buys a locomotive ready for its shift. A freight customer buys tonnes moved over a distance. Those two commitments belong on different lines of the budget.
Start with the service the contract requires. At a terminal, a locomotive and crew may need to be ready even when no wagons move. On the line, the return working still incurs costs even if every wagon comes back empty. A fuel bill alone cannot distinguish those duties.
Divide the costs of providing the agreed cover by the number of staffed, serviceable locomotive shifts delivered. Include crew, locomotive hire or allocated ownership costs, maintenance, fuel and any shore power. Report shift length, wagons handled and departures met alongside the rate. A paid standby shift remains a cost even if it handles no wagons.
Add the costs attributable to the loaded journey and empty return: energy, crew, locomotive and wagon costs, maintenance and track access. Divide by the sum of cargo tonnes multiplied by distance on each loaded leg, then multiply by 1,000. Wagon tare is excluded. An empty leg adds cost but no net tonne-kilometres.
If a terminal cost is billed into the line-haul contract, allocate it once. Keep tonnes of cargo separate from gross train weight, which is useful for comparing traction demand. If no cargo moves, report the cost of the working; there is no cost per net tonne-kilometre to quote.
At 19 Polish industrial sidings and yards, a study of older diesel-electric locomotives over roughly 1,000 hours reported engines idling for around 70% of operating time, with a range of 55–90%. The observations date from 2009–2013. They describe these locomotives and duties; they are not a target for a modern fleet.
A. Kałuża (2016) · Transportation Research Part D, 49, 82–93
Mark waits that protect the booked departure or are required for brake air, heating or restart readiness. Cost only the periods that can change under the operator’s approved procedures. Count fuel avoided at the depot’s net price, deduct any replacement energy, and credit crew or hire costs only if a paid shift or invoice actually changes.
The Office of Rail and Road reports 149 million litres of traction diesel and 56 million kWh of traction electricity for freight in April 2025–March 2026. The chart compares emissions for the freight operations covered, including diesel and electricity. It does not give a diesel locomotive’s exhaust factor.
Office of Rail and Road · Rail environment 2025/26, pp. 14–15
| Reporting year (April–March) | kg CO₂e per 1,000 net tonne-km |
|---|---|
| 2024/25 | 25.3 |
| 2025/26 | 24.7 |
Both years use the October 2026 release, including its revised prior-year value. One gram of CO₂e per net tonne-kilometre equals one kilogram per 1,000 net tonne-kilometres. A change in the national figure alone cannot establish that a particular route became more efficient.
Illustration, independent of the British data: allow 200 km loaded and 200 km empty for both round trips. Hold the total cost of the whole round trip constant to isolate the effect of payload. The table uses an index, with service A set to 100; no fuel price or tariff is assumed.
| Round-trip measure | Service A | Service B |
|---|---|---|
| Cargo on the loaded leg (t) | 1,000 | 800 |
| Loaded distance (km) | 200 | 200 |
| Empty return distance (km) | 200 | 200 |
| Freight work (net tonne-km) | 200,000 | 160,000 |
| Cost per 1,000 net tonne-km (index) | 100 | 125 |
At 800 rather than 1,000 tonnes, the same round-trip budget is spread over 160,000 instead of 200,000 net tonne-kilometres. The unit cost rises by 25%. No extra fuel use is implied; actual fuel demand may change with train weight, stops and gradients.
Price the required yard cover and the line-haul work separately. Check departure reliability, empty movements and the usable payload before comparing bids. For a route emissions budget, use actual litres and metered kWh with separate, documented factors for the fuel and electricity supply.
Separate yard shunting from line haul. Review locomotive waiting time; use approved automatic engine stop/start or auxiliary power only where temperature, brake-air requirements and restart readiness permit.
For the yard, track cost per staffed, available shift with wagons handled and departures met. For line haul, use cost and fuel per 1,000 net tonne-kilometres; gross tonne-kilometres help explain traction demand.
Technical references: U.S. EPA · Rail facilities ↗
For suitable combustion engines, nanoEFX is costed per filter application; fuel additives are costed on the quantity of fuel actually treated. Compare with unchanged maintenance and the same useful output.
A locomotive comparison should identify whether it concerns shunting, line-haul freight or another service. Train weight, gradient, stops and the share of idling affect consumption. Annual kilometres can support an estimate, while fuel per tonne-kilometre can give a different view of productive work. Do not combine electric traction energy and diesel fuel without a clearly defined method. The appropriate comparison is the same service delivered under comparable conditions, including the operational consequences of any new measure.
Electricity as a share of EU final energy consumption in rail transport. These two reference years describe the network, not a diesel locomotive.

A shunting locomotive at Hannover station.
Christian A. Schröder · CC BY-SA 4.0 · WebP| Operating record | What to collect |
|---|---|
| Operating metric | Cost per available shunting shift; cost per 1,000 net tonne-km on the line |
| Compare like with like | Separate shunting and line-haul work; record train mass |
| Costs to record | Fuel cost per duty cycle |
Document fuel, operating hours, load and the relevant output.
Consider operational measures and suitable technologies against the specific application.
Compare results against a representative baseline and include implementation costs.
Sector context and emissions factor are not evidence of product performance.
← Industry overviewDescribe your diesel locomotives and rail vehicles, their engines and typical operating conditions. Discuss with our team what information is needed to assess a potential application.