What does it cost to process a tonne of material that meets the customer’s specification? A machine can burn less diesel per hour while costing the business more per tonne.

Why it matters

Follow the material from the fuel tank to the weighbridge

For a crushing or sorting line, start with the output the customer accepts. Match fuel consumed during the shift to tonnes of finished material weighed for the same shift. Record feed, rejects and material sent back through the line separately. Counting the same tonne every time it passes a crusher overstates production.

Decide which machines the budget covers. If a loader feeds the crusher and another removes finished material, include their fuel when costing the whole line. Keep process heat, purchased electricity and fuel used by other activities on separate lines. For a pump, compare volume delivered at a comparable head; for a compressor, compare air volume on the same reference basis and at the same delivery pressure.

An example from Finland: Pärhä Oy reported about 0.7 litres of fuel per tonne of aggregate produced for its crushing and screening equipment and two wheel loaders together. The operator’s calculation, published by equipment supplier Metso in 2025, describes that operation. It is neither a single-engine figure nor a target for another site. Pärhä Oy / Metso · 2025 ↗

Industrial finance · Trial budget

What does one application cost across all the shifts it covers?

A shift log records fuel and production. A trial budget covers the whole measurement period. Record an application once when it takes place and compare its cost with production across the same period.

How to allocate a trial invoice

Cost allocation only: suppose total trial costs are €150 for a three-month period in which the plant actually runs 60 shifts. That is €2.50 per shift. If €150 is instead the price of each application, multiply it by the documented number of applications first. Neither 60 shifts nor €150 is a default for an industrial machine.

Trial duration and reapplication are different

NanoEFX recommends at least three months of records for a field trial. Its product guidance gives approximately 5,000–12,000 km between applications in routine service for cars, trucks and buses, depending on duty. For heavy plant in quarries, the service interval is based on operating hours and engine size. The measurement period is not a guarantee of the life of one treatment.

nanoEFX · Product and service intervals · nanoEFX · Trial measurement protocol · nanoEFX · Quarry and mining equipment

Use the actual trial-period totals for the same machines: diesel drawn, accepted tonnes counted once, shifts worked and operating hours. Compare them with a documented untreated reference period of similar material and duty. Do not multiply one favourable shift by the length of the trial.

Divide reference litres by accepted reference tonnes and apply that rate to trial output. Compare that quantity with the litres actually used in the trial at the trial’s weighted net price. Deduct the total trial cost once. The per-shift, per-hour and per-tonne amounts are alternative allocations of that same cost.

Different production, fuel prices or duty can change the result. A difference at equal output does not prove a product effect or an absolute reduction in CO₂. If output is zero, fuel spend still counts but a cost per tonne cannot be calculated.

Sources and scope: U.S. Department of Energy · Energy intensity baselines (2020) · Field study on wheel loaders

Ways to reduce costs

Operating decisions

For an engine-driven compressor, find leaks and check the minimum pressure required by the process before increasing engine speed or pressure. Repair one circuit, then repeat the duty cycle. Do not reduce required tool pressure.

What to measure

Compare fuel per unit of air delivered at the same pressure and quality. Include repair labour, stoppage and maintenance; use a separate baseline for pumps or crushers.

Technical references: U.S. Department of Energy · Better Plants ↗

For suitable combustion engines, nanoEFX is costed per filter application; fuel additives are costed on the quantity of fuel actually treated. Compare with unchanged maintenance and the same useful output.

Put idle time in the shift account

Shift fuel cost per accepted tonne = total litres consumed in the shift × actual delivered fuel price per litre ÷ accepted tonnes. Include fuel burned while waiting for material or transport. If idle fuel is already in the shift total, do not add it again. Distinguish waiting with the engine running from downtime with the engine switched off.

For full operating cost per tonne, add the shift’s labour, maintenance and allocated equipment costs before dividing. Record a shift with no accepted output as a cost for the period; its cost per tonne is undefined. When combining shifts, divide total cost by total accepted tonnes rather than averaging each shift’s rate.

Why litres per hour can change the order of a comparison

In a field study at Çan Lignite Enterprises in Türkiye, one operator loaded trucks with compacted lignite. The comparison covered 200 loading observations over 18 days. The bars show estimated litres per truck loaded, not litres per tonne.

One site, five wheel loaders: hourly fuel use and work completed
Wheel loaderSite average (L/h)Loading time (s/truck)Estimated L/truck
Kawasaki 11535.592.10.91
Cat 992K52.970.91.04
Komatsu WA500 (A)32.2145.31.30
Komatsu WA500 (B)34.1153.41.45
Komatsu WA80068.770.61.35

The WA500 (A) used less diesel per hour than the Kawasaki 115, but took longer to load each truck. Its estimated fuel use per truck was therefore higher.

The author combined the site’s 2022 average fuel rates with observed mean loading times: L/h × seconds per truck ÷ 3,600. The final column reproduces the study’s rounded results; fuel was not metered for each load. Machine ages and service histories differed. These observations do not rank new models or establish an industry benchmark.

Source: A. Çelik · JSAIMM 124 (2024) · 705, 710 ↗

Visual industry analyses

How much industrial energy comes from oil products?

EU · 2023 / 2024

Oil and petroleum products as a share of EU industrial final energy use. The figures cover industrial processes as well as engines.

%
  • 202311.4 %
  • 202410.4 %
Source: Eurostat · 2024 ↗ · Source: Eurostat · 2023 ↗
Portable compressors at a worksite.
Operating context

Portable compressors at a worksite.

GT1976 · CC BY-SA 4.0 · WebP
Data for your assessment
Operating recordWhat to collect
Operating metricFuel per unit of useful output
Compare like with likeSeparate process heat, feedstock and engine use
Costs to recordFuel and servicing per shift
Regional energy use

EU industrial energy mix, 2024

Final energy across industry, including processes and electricity; not engine fuel alone.

Electricity33.3 %
Natural gas31.9 %
Renewables and biofuels11.3 %
Oil products10.4 %
Solid fossil fuels5.5 %
Heat5.5 %
Non-renewable waste2.1 %
Source · Eurostat ↗

IEA: Industry generated approximately 9 Gt of direct CO₂ emissions worldwide in 2022, including industrial processes; this is not an engine-only figure. IEA · 2023 ↗

Questions for finance teams

What if our accounts show fuel deliveries rather than fuel consumed?

Reconcile the opening tank stock, deliveries, transfers and closing stock. For a shared tank, allocate withdrawals to the machines in scope. If fuel can only be reconciled for the whole month, compare it with that month’s accepted output rather than assigning it to a single shift.

How do we tell whether a change in cost came from price, load or waiting?

Compare shifts with similar material, product specification and haul distance. Put actual L/t, accepted t/h, the delivered price per litre and recorded idle hours side by side. Reprice both shifts at the same fuel price to isolate the price effect. Check the shift log before attributing a remaining difference to a machine.

How should finance report the emissions alongside cost?

Multiply litres actually consumed by the combustion CO₂ factor for the fuel used. Report both the shift total and CO₂ per accepted tonne. A different purchase price changes the bill without changing emissions. Purchased electricity and process emissions belong in separate calculations. US EPA · CO₂ ↗

Sources and evidence

Sector context and emissions factor are not evidence of product performance.

← Industry overview

Image source: Dortmund coking plant Hansa compressor hall · Arnoldius · 2017 · CC BY-SA 4.0 · Cropped and resized; the adapted photograph is licensed under CC BY-SA 4.0.

Discuss technology use for your industrial equipment

Describe your industrial equipment and specialist engines, their engines and typical operating conditions. Discuss with our team what information is needed to assess a potential application.

Discuss potential applications