Operating decisions
For an engine-driven compressor, find leaks and check the minimum pressure required by the process before increasing engine speed or pressure. Repair one circuit, then repeat the duty cycle. Do not reduce required tool pressure.

What does it cost to process a tonne of material that meets the customer’s specification? A machine can burn less diesel per hour while costing the business more per tonne.
For a crushing or sorting line, start with the output the customer accepts. Match fuel consumed during the shift to tonnes of finished material weighed for the same shift. Record feed, rejects and material sent back through the line separately. Counting the same tonne every time it passes a crusher overstates production.
Decide which machines the budget covers. If a loader feeds the crusher and another removes finished material, include their fuel when costing the whole line. Keep process heat, purchased electricity and fuel used by other activities on separate lines. For a pump, compare volume delivered at a comparable head; for a compressor, compare air volume on the same reference basis and at the same delivery pressure.
An example from Finland: Pärhä Oy reported about 0.7 litres of fuel per tonne of aggregate produced for its crushing and screening equipment and two wheel loaders together. The operator’s calculation, published by equipment supplier Metso in 2025, describes that operation. It is neither a single-engine figure nor a target for another site. Pärhä Oy / Metso · 2025 ↗
Industrial finance · Trial budget
A shift log records fuel and production. A trial budget covers the whole measurement period. Record an application once when it takes place and compare its cost with production across the same period.
Cost allocation only: suppose total trial costs are €150 for a three-month period in which the plant actually runs 60 shifts. That is €2.50 per shift. If €150 is instead the price of each application, multiply it by the documented number of applications first. Neither 60 shifts nor €150 is a default for an industrial machine.
NanoEFX recommends at least three months of records for a field trial. Its product guidance gives approximately 5,000–12,000 km between applications in routine service for cars, trucks and buses, depending on duty. For heavy plant in quarries, the service interval is based on operating hours and engine size. The measurement period is not a guarantee of the life of one treatment.
nanoEFX · Product and service intervals · nanoEFX · Trial measurement protocol · nanoEFX · Quarry and mining equipment
Use the actual trial-period totals for the same machines: diesel drawn, accepted tonnes counted once, shifts worked and operating hours. Compare them with a documented untreated reference period of similar material and duty. Do not multiply one favourable shift by the length of the trial.
Divide reference litres by accepted reference tonnes and apply that rate to trial output. Compare that quantity with the litres actually used in the trial at the trial’s weighted net price. Deduct the total trial cost once. The per-shift, per-hour and per-tonne amounts are alternative allocations of that same cost.
Different production, fuel prices or duty can change the result. A difference at equal output does not prove a product effect or an absolute reduction in CO₂. If output is zero, fuel spend still counts but a cost per tonne cannot be calculated.
Sources and scope: U.S. Department of Energy · Energy intensity baselines (2020) · Field study on wheel loaders
For an engine-driven compressor, find leaks and check the minimum pressure required by the process before increasing engine speed or pressure. Repair one circuit, then repeat the duty cycle. Do not reduce required tool pressure.
Compare fuel per unit of air delivered at the same pressure and quality. Include repair labour, stoppage and maintenance; use a separate baseline for pumps or crushers.
Technical references: U.S. Department of Energy · Better Plants ↗
For suitable combustion engines, nanoEFX is costed per filter application; fuel additives are costed on the quantity of fuel actually treated. Compare with unchanged maintenance and the same useful output.
Shift fuel cost per accepted tonne = total litres consumed in the shift × actual delivered fuel price per litre ÷ accepted tonnes. Include fuel burned while waiting for material or transport. If idle fuel is already in the shift total, do not add it again. Distinguish waiting with the engine running from downtime with the engine switched off.
For full operating cost per tonne, add the shift’s labour, maintenance and allocated equipment costs before dividing. Record a shift with no accepted output as a cost for the period; its cost per tonne is undefined. When combining shifts, divide total cost by total accepted tonnes rather than averaging each shift’s rate.
In a field study at Çan Lignite Enterprises in Türkiye, one operator loaded trucks with compacted lignite. The comparison covered 200 loading observations over 18 days. The bars show estimated litres per truck loaded, not litres per tonne.
| Wheel loader | Site average (L/h) | Loading time (s/truck) | Estimated L/truck |
|---|---|---|---|
| Kawasaki 115 | 35.5 | 92.1 | 0.91 |
| Cat 992K | 52.9 | 70.9 | 1.04 |
| Komatsu WA500 (A) | 32.2 | 145.3 | 1.30 |
| Komatsu WA500 (B) | 34.1 | 153.4 | 1.45 |
| Komatsu WA800 | 68.7 | 70.6 | 1.35 |
The WA500 (A) used less diesel per hour than the Kawasaki 115, but took longer to load each truck. Its estimated fuel use per truck was therefore higher.
The author combined the site’s 2022 average fuel rates with observed mean loading times: L/h × seconds per truck ÷ 3,600. The final column reproduces the study’s rounded results; fuel was not metered for each load. Machine ages and service histories differed. These observations do not rank new models or establish an industry benchmark.
Oil and petroleum products as a share of EU industrial final energy use. The figures cover industrial processes as well as engines.

Portable compressors at a worksite.
GT1976 · CC BY-SA 4.0 · WebP| Operating record | What to collect |
|---|---|
| Operating metric | Fuel per unit of useful output |
| Compare like with like | Separate process heat, feedstock and engine use |
| Costs to record | Fuel and servicing per shift |
Final energy across industry, including processes and electricity; not engine fuel alone.
| Electricity | 33.3 % |
|---|---|
| Natural gas | 31.9 % |
| Renewables and biofuels | 11.3 % |
| Oil products | 10.4 % |
| Solid fossil fuels | 5.5 % |
| Heat | 5.5 % |
| Non-renewable waste | 2.1 % |
IEA: Industry generated approximately 9 Gt of direct CO₂ emissions worldwide in 2022, including industrial processes; this is not an engine-only figure. IEA · 2023 ↗
Reconcile the opening tank stock, deliveries, transfers and closing stock. For a shared tank, allocate withdrawals to the machines in scope. If fuel can only be reconciled for the whole month, compare it with that month’s accepted output rather than assigning it to a single shift.
Compare shifts with similar material, product specification and haul distance. Put actual L/t, accepted t/h, the delivered price per litre and recorded idle hours side by side. Reprice both shifts at the same fuel price to isolate the price effect. Check the shift log before attributing a remaining difference to a machine.
Multiply litres actually consumed by the combustion CO₂ factor for the fuel used. Report both the shift total and CO₂ per accepted tonne. A different purchase price changes the bill without changing emissions. Purchased electricity and process emissions belong in separate calculations. US EPA · CO₂ ↗
Sector context and emissions factor are not evidence of product performance.
← Industry overviewImage source: Dortmund coking plant Hansa compressor hall · Arnoldius · 2017 · CC BY-SA 4.0 · Cropped and resized; the adapted photograph is licensed under CC BY-SA 4.0.