Illustration of a generator inside an industrial building
ECO EFX Solutions · Industry overview

Power generation

What does one kilowatt-hour delivered to your site actually cost? A diesel set that supplies daily power and one kept for outages serve different budgets, even if their nameplates are identical.

Preparing an application review for your generators

When a review is useful

Distinguish continuous generation, part-load operation and standby readiness. A useful comparison matches fuel use with load and electricity delivered, rather than comparing running hours alone.

What data to prepare

Generator, engine and air-filter details; fuel quantities, load profile, running hours and delivered net kWh for the same period. Record maintenance and standby costs separately from generation costs.

What to discuss with ECO EFX

Discuss your operating mode and available measurements with our team. Clarify missing technical information and how a comparable operating period could be documented. Suitability and any effect need assessment for the specific generator.

Discuss your application
Why it matters

What does the site pay for electricity and what does it pay for backup?

A plant running on its own generators buys energy. A site keeping a generator on standby also buys the ability to carry critical loads through an outage. The same cost per kilowatt-hour cannot answer both budget questions.

Regular supply

At the site meter, record the electricity the plant actually receives after auxiliary use. Reconcile fuel stocks and invoices for the same year. Compare the cost per net kWh at the same level of service.

Part-load operation

Group the operating records by load. Add fuel and net kWh across all intervals before dividing. Averaging hourly consumption or the ratios for individual shifts gives each shift the same weight, regardless of its output.

The published load curve ↗

Standby

Specify the critical load and the hours it must be supported. Separate the annual cost of keeping that capacity available from the cost of running during an outage. Fuel burned in tests is a cost even when the test delivers no electricity to the site.

How a backup study treats test fuel ↗

Finance brief · Worked example

What does one kilowatt-hour of on-site power cost at the actual load?

€0.672/kWhCost per kWh including entered costs · Example assumptions

A generator is paid for in fuel and operating costs, but the plant receives electricity. Compare alternatives using the net kWh delivered to the same meter over the same period.

Example assumptions

Published reference: Caterpillar DE200E3, 144 kW prime rating, 50 Hz. At 50% load the data sheet lists 23.9 L/h for 72 kW. The example assumes 2,000 hours at that point, all 72 kW delivered, and a net diesel price of €1.50/L. The hours, delivery and price are assumptions.

Annual result

The example delivers 144,000 kWh from 47,800 L. Fuel costs €71,700, or €0.498/kWh. Adding an assumed €25,000 for annual service and rental brings the stated cost to €0.672/kWh. Include only costs borne by the site; do not add depreciation again if rental already covers the equipment.

Why litres per hour can mislead

At 75% load this model uses more fuel per hour (32.9 L/h) but also delivers more at its terminals (108 kW). The reference intensities are 0.332 and 0.305 L/kWh at 50% and 75% load. These are two manufacturer test points, not evidence of savings at your site. For variable loads, divide total litres by total metered net kWh.

Sources and scope: Caterpillar · LEHE1170-04 · 05/2025 · Prime-load fuel consumption · p. 1

Ways to reduce costs

Operating decisions

Review the load curve before adding capacity. Where redundancy and the manufacturer’s operating limits allow, test whether staging generator sets avoids prolonged light loading. Include start-up, standby and any load-bank fuel.

What to measure

Compare fuel per net kWh delivered at the same meter and demand profile. Keep reserve capacity and outage protection unchanged; check whether lower consumption reduces purchases.

Technical references: Caterpillar · Generator set underloading ↗

For suitable combustion engines, nanoEFX is costed per filter application; fuel additives are costed on the quantity of fuel actually treated. Compare with unchanged maintenance and the same useful output.

From the fuel invoice to a cost per delivered kWh

Fuel cost per delivered kWh = litres consumed × delivered price per litre ÷ net kWh metered. Use the same period, currency and tax basis throughout. For total cost per kWh, add the period’s maintenance, staffing and allocated capital costs to fuel expenditure before dividing. If no electricity reached the site, report the period’s cost separately; cost per delivered kWh is undefined.

Visual industry analyses

The same generator at three loads

At half load, the reference set burns less fuel each hour but uses more fuel per kWh than at full load. The comparison below uses published figures for one generator configuration; it is not a target for your site. Source: Caterpillar · DE200E3 · LEHE1170-04 · 05/2025 ↗

Cat DE200E3 · 50 Hz · 144 kW PRP

Diesel consumption per hour at three steady loads. These are Caterpillar specification figures for the DE200E3 with a C7.1 engine, 50 Hz, rated at 144 kW of prime electrical power. They are not measurements from an ECO EFX project.

L/h
  • 50 %23.9 L/h
  • 75 %32.9 L/h
  • 100 %41.9 L/h
Source: Caterpillar · DE200E3 · LEHE1170-04 · 05/2025 ↗
An operator records gauge readings in a marine emergency generator space. The photograph does not depict the model in the chart.
Operating context

An operator records gauge readings in a marine emergency generator space. The photograph does not depict the model in the chart.

Timothy A. Hazel / U.S. Navy · Public domain (US) · WebP
From hourly fuel use to litres per electrical kWh
LoadElectrical output (kW)Diesel (L/h)Fuel intensity (L/kWh)
50 %7223.90.332
75 %10832.90.305
100 %14441.90.291

Calculation: divide the stated litres per hour by electrical output at that load. Values are rounded to three decimals. The denominator here is generator output, before any separate site losses; use metered net kWh for your own budget. Source: Caterpillar · DE200E3 · LEHE1170-04 · 05/2025 ↗

Data for your assessment
Operating recordWhat to collect
Electrical outputRecord delivered kWh and the load range during each interval.
Fuel quantityMatch litres and running hours; separate standby tests from normal generation.
BudgetUse the delivered fuel price and account for maintenance and downtime.

Regional questions for your operation

The same comparison needs may be expressed with different fuel, vehicle and unit labels. Use these questions to prepare your operating records and discuss the intended application with ECO EFX.

Europe: DACH, UK, Scandinavia and SpainHow do generator running costs differ from standby costs?

Separate actual generation from readiness. Record fuel, load, running hours and delivered net kWh for the same operating period.

USA and CanadaHow should gallon-based generator fuel records be compared?

Identify the gallon standard, operating load and delivered net kWh. Use the calculator’s stated units; running hours alone do not describe output.

Spanish-speaking Latin AmericaWhat does a generador diésel or grupo electrógeno budget cover?

Record delivered electricity, fuel, maintenance and standby costs separately. A generator’s name or rated power does not establish its operating cost.

South Africa and West AfricaHow do diesel-generator and groupe électrogène records fit a site budget?

Separate continuous supply, part-load operation and standby. Use the actual fuel and net electricity delivered at the site, with the stated currency.

Saudi Arabia, UAE, Oman and QatarWhich auxiliary loads belong in the generator comparison?

Define the electrical meter boundary and document cooling or other auxiliary loads. Keep net electricity delivered and fuel use in the same period.

IsraelHow should a standby-generator budget be documented in Israel?

Define units consistently in Hebrew or English records. Separate readiness and maintenance costs from fuel and actual electricity generation.

RussiaWhich records are needed to assess diesel-generator fuel consumption?

Record operating mode, load, fuel quantities and delivered net kWh. Compare like-for-like output before interpreting a cost change.

IndiaDoes a DG set’s kVA rating describe the electricity delivered?

Keep rated kVA, operating load, running hours and net kWh separate. Compare diesel consumption against measured output, not the nameplate alone.

ChinaHow should generator fuel consumption be assessed at different loads?

Record the load profile and delivered net kWh alongside fuel quantities. Keep standby readiness distinct from actual generation.

Questions for finance teams

We have engine hours but no kWh reading. What can we budget?

Group hours by observed load and multiply each group by its representative litres per hour. Add the litres, then apply your delivered price. A flat nameplate kW multiplied by hours assumes full load throughout. Without an output reading or a documented load estimate you can budget fuel, but cannot establish a measured cost per kWh.

How should we compare standby contracts in a year with no outage?

Compare annual readiness cost for the required capacity and duration. Show scheduled test fuel and maintenance separately from any outage running costs. A load-bank test consumes fuel without necessarily delivering electricity to the site; do not count its test energy as useful site output.

Can a lower cost per kWh be reported as lower emissions?

No. A fuel discount can lower costs without changing litres burned. For combustion CO₂ per delivered kWh, multiply litres consumed by the fuel-specific CO₂ factor and divide by net metered kWh. Report total combustion CO₂ as well: a site delivering more electricity can lower its intensity while increasing total emissions. US EPA · CO₂ ↗

Discuss technology use for your generators

Describe your generators and standby power units, their engines and typical operating conditions. Discuss with our team what information is needed to assess a potential application.