Operating decisions
Coordinate truck dispatch and shovel loading to reduce queues without cutting shovel output. Review haul road condition and gradients before testing a change on comparable loaded and empty cycles.

A truck can burn fewer litres per hour and still cost more per tonne at the crusher. The comparison starts with the loaded trip, the empty return and the tonnes the crusher actually receives.
A shift fuel total cannot tell a quarry manager whether a new haul road pays for itself. Match the truck’s complete cycles to the tonnes received at the crusher in the same shift. Keep waste sent to the dump in its own account: it uses fuel and truck capacity but delivers no ore to the crusher.
Record loaded and empty kilometres separately, together with elevation gain in each direction, actual payload and queue time. Compare the same truck class and material. A shorter route can still have a steeper loaded climb; check measurements before crediting the distance reduction.
Value the full cycle’s diesel at the site’s net delivered price. Include attributable operator time, tyres, maintenance and road upkeep. If a contractor charges per tonne, check what the rate covers before adding fuel or labour. Report any road investment separately from recurring costs.
Haul cost per delivered tonne = costs attributable to crusher-bound cycles ÷ tonnes received at the crusher. Keep crushing and processing outside this transport measure.
Nobahar and colleagues monitored one haul truck at a copper mine for 90 days, recording 1,780 complete cycles. Their 2026 study maps fuel use by road segment. Some crusher-bound segments fell into the higher band too; the two routes overlap.
| Mapped route | Lowest band (g/t·km) | Highest band (g/t·km) |
|---|---|---|
| To the primary crusher | 65–70 | 70–75 |
| To the waste dump | 65–70 | 75–80 |
The bands show grams of fuel per tonne-kilometre, not litres per delivered tonne. The highest band occurred on parts of the uphill waste route. Grade, surface and alignment vary together; these measurements do not establish a fixed penalty per percentage point of gradient.
Where would a dispatch review start? In the same study, waiting to load accounted for 45% of truck idle time, and the crusher queue for 22%. Both are shares of idle time, not of total shift time or fuel.
Illustrative budget, independent of the study: both routes deliver 80 tonnes per trip. Assume 4 L/km loaded, 2 L/km empty and a further 2 L per cycle for loading, waiting and tipping. Hold payload, gradient, road condition and queueing equal to isolate distance.
| Cycle measure | Route A | Route B |
|---|---|---|
| Distance each way (km) | 3 | 4 |
| Diesel on loaded leg (L) | 12 | 16 |
| Diesel on empty return (L) | 6 | 8 |
| Loading, waiting and tipping (L) | 2 | 2 |
| Diesel per cycle (L) | 20 | 26 |
| Diesel per delivered tonne (L/t) | 0.25 | 0.325 |
At 100,000 tonnes delivered, the extra kilometre each way adds 7,500 litres under these assumptions. Multiply by your net price per litre for the fuel budget. Longer cycles can also affect tonnes per shift; this example assigns no value to that effect.
For fossil diesel, the extra 7,500 L in this example would add about 20.2 t of direct CO₂ at the US EPA factor of 10.21 kg CO₂ per US gallon. This covers combustion only.
Compare the annual costs under each route with the roadworks quote, the expected life of the route and the tonnes the crusher can receive. Test whether the apparent gain survives a change in payload, grade or queue time. For direct CO₂ per tonne, multiply measured L/t by a documented combustion factor for the fuel used. Report the emissions of roadworks separately.
Coordinate truck dispatch and shovel loading to reduce queues without cutting shovel output. Review haul road condition and gradients before testing a change on comparable loaded and empty cycles.
Track litres per tonne hauled at matched distance, elevation and payload. Count road upkeep, tyre wear and tonnes per shift alongside fuel to avoid moving costs elsewhere.
Technical references: Caterpillar · Mining trucks ↗
For suitable combustion engines, nanoEFX is costed per filter application; fuel additives are costed on the quantity of fuel actually treated. Compare with unchanged maintenance and the same useful output.
For haulage equipment, fuel per tonne moved needs to be read alongside haul distance, gradient, payload and queueing time. For stationary equipment, choose an output measure appropriate to the operation. A lower annual fuel bill caused by reduced production is not an efficiency improvement. Compare equivalent production and document maintenance or route changes during the assessment. High utilisation can make small unit-cost changes material, but implementation time, service requirements and production interruption must be included rather than assumed away.
IEA base case for an indicative refined copper project. These rounded model inputs are not observations from a mine or a global average.

A haul truck at Bingham Canyon mine.
Greg Goebel · CC BY-SA 2.0 · WebP| Operating record | What to collect |
|---|---|
| Operating metric | Litres per tonne hauled |
| Compare like with like | Grade, haul distance and payload |
| Costs to record | Fuel and downtime per tonne |
Document fuel, operating hours, load and the relevant output.
Consider operational measures and suitable technologies against the specific application.
Compare results against a representative baseline and include implementation costs.
Sector context and emissions factor are not evidence of product performance.